The Actual News

Just the Facts, from multiple news sources.

Undersea power cable diverted after "Harry Potter" fans complain

Undersea power cable diverted after "Harry Potter" fans complain

Summary

A power cable project between Ireland and the U.K. was changed after fans of the "Harry Potter" books raised concerns about disturbing a memorial to the character Dobby at a Welsh beach. The company building the cable moved the route to avoid the memorial and protect the site.

Key Facts

  • The project connects Ireland and the U.K. with a high-voltage electricity cable.
  • Part of the cable was originally planned to go through Freshwater West beach in Wales.
  • Fans complained that the cable would disturb a memorial for Dobby, a character from "Harry Potter."
  • The CEO of Etchea Energy did not initially know about the memorial during an interview.
  • After many complaints, the company changed the cable route to avoid the memorial.
  • The new cable path goes near ancient Bronze Age remains instead of the memorial site.
  • In 2022, the agency managing the beach asked fans to stop leaving items to protect local wildlife.
  • The company said this shows the need to be flexible in planning big projects.
Read the Full Article

This is a fact-based summary from The Actual News. Click below to read the complete story directly from the original source.